Callahan Construction Managers (Callahan) announces that they have completed the Hilton Garden Inn Brookline. The project was developed by Claremont Companies who also own and manage the property, with Cambridge Seven Associates serving as the architect, Stantec for civil and landscape, Odeh on structural, and WSP as the MEP/FP engineer.
The 11-story, 111,000 SF, Hilton Garden Inn features 174 guest rooms. Level 1 includes various amenities including a restaurant and bar, lounge areas, meeting room and 24-hour pavilion pantry. Level 3, of the hotel, includes a fitness center, indoor swimming pool, and outdoor terrace. Additionally, a 29-space parking garage occupies the hotel’s second level, providing ease of access for guests.
“Callahan is thrilled to have been a part of this high-profile hotel project just outside Boston,” stated Steve Callahan, Vice President of Business Development at Callahan. “The Hilton Garden Inn’s location on the Brookline/Boston line will provide much-needed hospitality services to the Greater Boston area.”
The property sought to maximize space at the narrow .437-acre lot. A curved corner design draws attention to the building, which sits at the intersection of Brookline Avenue and Route 9. The building also features a glass façade.
Located at 700 Brookline Ave, the property is the former site of a Gulf gas station that was demolished in 2016. The building is conveniently located adjacent to the Longwood Medical area and one block to the Riverway T Station.
Callahan is committed to building strong, long-lasting client relationships, and to consistently delivering solutions that exceed expectations. Contact us today about starting your next project.